Haines/Office Space Planning, Part 4
79
design-builder will give the owner a guaranteed price early
· How to size the implications of your needs.
in the project.
· How to determine whether to remodel and expand or
The disadvantage of the design-build approach is
build new.
that the early guaranteed price is often based on prelimi-
· The design process for your project.
nary design documents; the relationship between scope
· Financing options for your project.
and cost is ill defined. The owner accountability on the
· Construction delivery methods.
design-builder is not as comprehensive as it is in the de-
Taking these issues in sequence, answering each
sign-bid-build process in which a complete set of contract
question before proceeding to the next will allow you a
documents has been prepared.
smooth development process with the least amount of re-
dundancy and the least risk of pursuing a project that will
not come to fruition. Ultimately you may spend a year or
The disadvantage of the design-build
two going through all these steps.
approach is that the early guaranteed price
is often based on preliminary design
Taking these issues in sequence . . .
documents . . .
you may spend a year or two going
through all these steps.
Another disadvantage of design-build is that there is
no true marketplace test for the value of the project. The de-
However, when properly done, you will be able to
sign-builder has promised to deliver the building at a cer-
enjoy the results of this endeavor for many years. In re-
tain price. However, the design-builder's team develops
sponse to a comment that "it costs just as much to build
the quality and cost of the project is independent of the
a bad facility as it does to build a good one," a practice
owner or the owner's team. The savings that accrue to the
manager responded "Oh no! It is much more expensive
design-builder do not necessarily flow through to the owner.
to build a bad office." Of course, she was referring to the
operational realities of a bad office compared to that of a
CONCLUSION
good one. Economics aside, there is also an issue of qual-
ity of practice life. In the final analysis, you will spend
With this series of articles you have now learned:
many hours in your office. It should be an enjoyable place
· How to assess your needs.
to work, not only for you but also for your staff.
· How to assess your productivity potential.
Journal of Medical Practice Management