Haines and Griffin/Office Space Planning, Part 3
23
Figure 2. Room organization sample (shows relationships of
elements).
Figure 3. Sample exam room.
clusion, the design team will need to prepare detailed con-
struction documents, often referred to as "working draw-
ings." These documents spell out in detail the quality and
In either case, at the end of this phase, the cost of the
quantity of materials and how and where these materials
project is determined. However, the final cost of the build-
are to be installed.
ing is not determined until actual construction is started
The construction documents are extensive and de-
and finished. In the history of construction, a perfect set
scribe the building to the governing authorities, as well
of construction documents has never been created. There
as the contractor and sub-contractors that will perform
will always be coordination issues, missed items, and other
the construction. These documents also form the back-
construction-related costs that should be planned for (that
bone of the owner-contractor contract and define the re-
is why you have a contingency in the economic pro forma
sponsibilities of the contractor, the owner, and architect
discussed earlier).
during construction. These documents are then given to
Construction
the selected contractor or contractors for pricing.
This is when the building or suite is actually built.
Bidding and Negotiation
During the construction of the building, the contractor and
There are two basic methods that are used to select
the design team will handle many issues. You may be asked
a contractor to build a project (excluding design-build,
to approve some aspects of the project, and you will most
which will be discussed in Part 4 of this series), competi-
certainly find some things that you want to do differently.
tive bidding, or direct negotiation. When a project is com-
The contractor will generally submit payment ap-
petitively bid in the private marketplace, you are free to
plications monthly, and your design team will visit the
select and pre-qualify the general contractors for your pro-
construction site periodically and approve and certify the
contractor's application for payment. The local building
ject. Find contractors that are familiar with medical office
officials will also visit the site and inspect the work of the
construction, are appropriately sized, and have a track
contractor at various stages of the construction. When the
record of successful projects.
project nears completion, you and your design team will
When competitive bidding is selected, each general
inspect the work and develop a list of items (the punch
contractor is given the drawings and specifications and
list) that need to be addressed or completed.
asked to provide a bid due at a specific time and place.
Closing out the construction will require a signifi-
Under this method, the lowest qualified bidder is awarded
cant effort on everyone's part. The contractor will need to
the project. If the project is to be negotiated with a sin-
complete his work and provide the necessary closeout doc-
gle pre-selected general contractor, then the completed
uments, and you and the design team will need to make
drawings and specifications are given to him, and he/she
the final inspections and approvals. After the final touch-
will provide either a lump sum price or a guaranteed max-
up is complete, the facility will be ready for final move-in.
imum price.